SHORELAND ZONING PERMIT CHECKLIST
Appendix 1 (from MMA's Handbook for Local Planning Boards: A Legal Perspective, August 1982, rev. 1991)prepared by Rebecca Warren Seel, Senior Staff Attorney |
NOTE: THIS CHECKLIST IS INTENDED TO ASSIST THE CEO IN TRACKING A SHORELAND ZONING PERMIT THROUGH THE REVIEW PROCESS
This Maine Municipal Association publication is presented for "Classroom Use Only." Its intended use is to stimulate and aid in discussion and role playing within a classroom setting.
CHECKOFF FOR ALL STRUCTURES:
__ COMPLETE SHORELAND ZONING PERMIT APPLICATION
__ PAY APPROPRIATE FEE
__ LOT AREA
__ % OF LOT COVERED BY NON-VEGETATED SURFACES
__ HEIGHT OF STRUCTURE
__ SETBACK FROM HIGH WATER MARK
__ SETBACK FROM SIDE AND REAR LOT LINES
__ % INCREASE OF EXPANSIONS OF PORTION OF STRUCTURE WHICH IS LESS THAN REQUIRED SETBACK
__ COPY OF INTERIOR AND EXTERIOR PLUMBING PERMITS
__ COPY OF DEED
__ ELEVATION OF LOWEST FLOOR TO 100-YEAR FLOOD ELEVATION
__ COPY OF ADDITIONAL PERMIT(S) AS REQUIRED (See Page 5 of Application Form)
CHECKOFF FOR FURTHER REVIEW:
__COPY OF FILE TO BOARD OF APPEALS IF VARIANCE OR SPECIAL EXCEPTION IS REQUIRED
__COPY OF FILE TO PLANNING BOARD IF PLANNING BOARD REVIEW IS REQUIRED
CHECKOFF FOR SITE VISITS BY CEO:
__ PRIOR TO CLEARING AND EXCAVATION
__PRIOR TO FOUNDATION POUR
__PRIOR TO FINAL LANDSCAPING
__PRIOR TO OCCUPANCY