SHORELAND ZONING PERMIT CHECKLIST

Appendix 1

(from MMA's Handbook for Local Planning Boards: A Legal Perspective, August 1982, rev. 1991)
prepared by Rebecca Warren Seel, Senior Staff Attorne
y


NOTE: THIS CHECKLIST IS INTENDED TO ASSIST THE CEO IN TRACKING A SHORELAND ZONING PERMIT THROUGH THE REVIEW PROCESS

This Maine Municipal Association publication is presented for "Classroom Use Only."  Its intended use is to stimulate and aid in discussion and role playing within a classroom setting.

CHECKOFF FOR ALL STRUCTURES:

__ COMPLETE SHORELAND ZONING PERMIT APPLICATION

__ PAY APPROPRIATE FEE

__ LOT AREA

__  % OF LOT COVERED BY NON-VEGETATED SURFACES

__ HEIGHT OF STRUCTURE

__ SETBACK FROM HIGH WATER MARK

__ SETBACK FROM SIDE AND REAR LOT LINES

__ % INCREASE OF EXPANSIONS OF PORTION OF STRUCTURE WHICH IS LESS THAN REQUIRED SETBACK

__ COPY OF INTERIOR AND EXTERIOR PLUMBING PERMITS

__ COPY OF DEED

__ ELEVATION OF LOWEST FLOOR TO 100-YEAR FLOOD ELEVATION

__ COPY OF ADDITIONAL PERMIT(S) AS REQUIRED (See Page 5 of Application Form)

CHECKOFF FOR FURTHER REVIEW:

__COPY OF FILE TO BOARD OF APPEALS IF VARIANCE OR SPECIAL EXCEPTION IS REQUIRED

__COPY OF FILE TO PLANNING BOARD IF PLANNING BOARD REVIEW IS REQUIRED

CHECKOFF FOR SITE VISITS BY CEO:

__ PRIOR TO CLEARING AND EXCAVATION

__PRIOR TO FOUNDATION POUR

__PRIOR TO FINAL LANDSCAPING

__PRIOR TO OCCUPANCY